
Kolkata — A massive 100-hour mega block has been announced on the Sealdah-Dankuni railway line, disrupting services for four consecutive days from January 23 to January 26. This extensive power block is set to impact not just local train commuters but also passengers on several long-distance express routes.
The Eastern Railways has cited essential railway line work as the reason for this major interruption. Officials assured that the project aims to improve operational efficiency and increase train speeds once completed. However, in the interim, thousands of daily commuters will face significant inconvenience due to the cancellation of numerous trains and rerouting of key services.
Train Cancellations and Rerouted Services
The cancellations will affect a wide range of local trains on the Sealdah-Dankuni branch. Services including trains numbered 32212 through 32250 from Sealdah to Dankuni and their corresponding return journeys (32211 through 32249) have been suspended for the block period.
Additionally, select trains operating on the Sealdah-Baruipur route, including 32411, 32413, and 32414, will also remain cancelled. Beyond local trains, several express services have been either cancelled, rescheduled, or rerouted to minimize disruption to long-distance passengers.
Commuter Concerns and Railways’ Assurance
This announcement has left daily commuters and office-goers scrambling for alternative travel options. While the railways have expressed regret for the inconvenience, they reiterated that this “mega block” is necessary for crucial infrastructural upgrades. Officials emphasized that the completion of these works will enhance passenger safety and operational reliability on the affected routes.
Alternatives for Commuters
To cope with the disruptions, Eastern Railways has advised passengers to stay updated on train schedules through their official channels and to consider alternate travel modes. Increased services on adjacent routes and enhanced bus connectivity are expected to be introduced to accommodate the surge in demand.
Key Details to Note
- Dates: January 23 to January 26
- Duration: 100 hours of continuous block
- Affected Routes: Sealdah-Dankuni, Sealdah-Baruipur
- Cancelled Trains: 32212–32250 (Sealdah-Dankuni) and 32411–32414 (Sealdah-Baruipur)
For passengers planning long-distance travel during this period, it is strongly advised to confirm train schedules and rerouted services in advance. Stay tuned to updates from Eastern Railways for real-time information.
While the temporary suspension is a setback for commuters, the railways assure that these upgrades will pave the way for a smoother, faster, and safer travel experience in the future.